Sample Projects

Valley Farms Arsenic Treatment Facility

Project Overview Felix teamed with GHD, Inc as the Design-Build team for the installation of an absorption arsenic removal system at two wells in the City of Coolidge. Scope included an 8-foot diameter arsenic pressure vessel, a 10,500 gallon backwash tank was designed to collect and store the backwash and forward rinse from the arsenic vessel. Role: Design-Build Owner: […]

Read More ›

Peoria Water, Wastewater Treatment and Offsite Facilities Job Order Contract

Felix was selected as the prime Job Order Contractor for this 1 year Water/Wastewater JOC contract by the City of Peoria and had the contract extended two times for an additional 2 years each due to excellent performance.

Read More ›