Project Overview Felix teamed with GHD, Inc as the Design-Build team for the installation of an absorption arsenic removal system at two wells in the City of Coolidge. Scope included an 8-foot diameter arsenic pressure vessel, a 10,500 gallon backwash tank was designed to collect and store the backwash and forward rinse from the arsenic vessel. Role: Design-Build Owner: […]
Read More › Felix was selected as the prime Job Order Contractor for this 1 year Water/Wastewater JOC contract by the City of Peoria and had the contract extended two times for an additional 2 years each due to excellent performance.
Read More › Felix Construction was the General Contractor on this 5 MGD Reverse Osmosis Water Treatment Plant project for the Gila River Indian Community in Sacaton, AZ.
Read More › Felix Construction was selected as the prime Construction Manager at Risk contractor on this 4.5MGD regional water production, storage, and treatment facility for the City of Buckeye, AZ.