Project Overview
Felix teamed with GHD, Inc as the Design-Build team for the installation of an absorption arsenic removal system at two wells in the City of Coolidge. Scope included an 8-foot diameter arsenic pressure vessel, a 10,500 gallon backwash tank was designed to collect and store the backwash and forward rinse from the arsenic vessel.
Role: Design-Build
Owner: Arizona Water Company
Location: Coolidge, AZ
Services Rendered
Preconstruction Services: Conceptual Cost Estimating, Design Assistance, Scheduling, Value Engineering, Hazard Analysis, Alternative System Analysis.
Construction Services: Mechanical, Civil, Electrical, Control Panels.