Scope included 3,000 GPM/400 hp well pump, recovery & pump-to-waste facilities, chlorine analyzer, sodium bisulfite system, nitrate analyzer, and water flush lubrication system for well pump. The construction was spread throughout the entire Deer Valley Water Treatment Facility. All new piping, electrical and instrumentation were included.