Felix Construction was the Prime Contractor and Brown and Caldwell was the design engineer for this D-B project in Surprise, AZ. The scope involved optimizing the solids handling capability at the SPA1 WRF by installing an additional centrifuge and conveyor assembly system in the dewatering facility. In addition, this project provided protection for a portion of the WAS piping network by creating a new routing scheme and installing new meters and piping. Several equipment components installed on this project were done with the long-term planning goal of getting SPA1’s reclaimed water up to Bell Road Lake for future groundwater recharge.