Expansion of the existing Alta Vista Pump Station. Includes demolition of the existing pump station and construction of the new pump station in the same footprint as the old pump station while ensuring that the City of Keller meets their water demands during construction. Includes purchase and installation of four new horizontal centrifugal pumps, generator, electrical gear and yard piping / civil upgrades.