The construction of a new 24 MGD initial capacity, 45 MGD future capacity, lift station in northwest Phoenix including wet well with two chambers, installation of 3 240 hp submersible pumps, double level discharge header, four 24” force mains, a 54” PVC lined RCP influent line, biofilter odor control, chemical odor control, electrical building, standby generator, +/- 1,500 lf of decorative CMU site wall, private drive, and all civil/site work. This site was built specifically to handle all the flows from TSMC’s $12 billion dollar chip manufacturing.
Lift Station 77