The construction of a new 24 MGD initial capacity, 45 MGD future capacity, lift station in northwest Phoenix including wet well with two chambers, installation of 3 240 hp submersible pumps, double level discharge header, four 24” force mains, a 54” PVC lined RCP influent line, biofilter odor control, chemical odor control, electrical building, standby generator, +/- 1,500 lf of decorative CMU site wall, private drive, and all civil/site work. This site was built specifically to handle all the flows from TSMC’s $12 billion dollar chip manufacturing.
Lift Station 77
Prev
![](https://felixconstruction.com/wp-content/uploads/2024/05/IMG_0474-150x150.jpg)
![](https://felixconstruction.com/wp-content/uploads/2024/05/IMG_0474-150x150.jpg)
GL03 Metering Station Improvements
03 May 2024
Next
![](https://felixconstruction.com/wp-content/uploads/2024/05/01-SWSectorPumpStation_HDR-1-150x150.jpg)
![](https://felixconstruction.com/wp-content/uploads/2024/05/01-SWSectorPumpStation_HDR-1-150x150.jpg)
Southwest Sector Pump Station
09 May 2024
![April 2023 (55) April 2023 (55)](https://felixconstruction.com/wp-content/uploads/2024/02/April-2023-55-600x400.jpg)
![April 2023 (55) April 2023 (55)](https://felixconstruction.com/wp-content/uploads/2024/02/April-2023-55-600x400.jpg)
![April 2023 (71) April 2023 (71)](https://felixconstruction.com/wp-content/uploads/2024/02/April-2023-71-600x400.jpg)
![April 2023 (71) April 2023 (71)](https://felixconstruction.com/wp-content/uploads/2024/02/April-2023-71-600x400.jpg)
![51 51](https://felixconstruction.com/wp-content/uploads/2024/02/51-600x400.jpg)
![51 51](https://felixconstruction.com/wp-content/uploads/2024/02/51-600x400.jpg)