The 7A-GS2 Reservoir Facility is located at 56th Street and Pinnacle Peak Road. The project scope included construction of a 3 MG Cast-in-Place (CIP) concrete reservoir, valve vault w/ large diameter piping, 24-inch DI pipe transmission and distribution lines, chlorine building w/ electrical gear and double contained gas chlorine system, booster pump station, 1,200 LF of an 8-foot decorative cast in place site perimeter wall, instrumentation & controls and programming for the facility.