This project is the construction of a regional water production facility for the City of Surprise. The construction includes two remote well sites with vertical turbine deep well pumps, mechanical piping, individual electrical services, control panels and backup generators. The water campus construction includes a 1.5 million gallon above grade steel reservoir, 6 vertical turbine booster pump station with hydropneumatics tank, mechanical piping instrumentation and chemical disinfection facilities. The water campus also has a complete masonry electrical building with chemical pump facilities, electrical service and backup generator. General site services include mass grading, site flood protection retaining wall, drywells, masonry site wall and City of Surprise security devices.
West Deer Valley Water Group BPS, Reservoir, and Wells