Expansion of the existing Alta Vista Pump Station. Includes demolition of the existing pump station and construction of the new pump station in the same footprint as the old pump station while ensuring that the City of Keller meets their water demands during construction. Includes purchase and installation of four new horizontal centrifugal pumps, generator, electrical gear and yard piping / civil upgrades.
Alta Vista Pump Station Improvements
Prev
Well 26 and Bullard Water Campus RO Facility Upgrades
27 April 2021
Next
Phoenix Booster Pump Station Rehab Program
07 July 2021
``Felix Construction's ability to think outside the box was a key factor in the success of the Preconstruction Phase of Keller's first CMAR project. The Felix team presented ideas that ultimately resulted in a GMP within the City's initial budget while simultaneously allowing the start of construction almost one year ahead of schedule.``
Dennis Fritz, P.E.
Senior Engineer, City of Keller