Sample Projects

23rd Ave WWTP Job Order Contract

Felix was selected as the Job Order Contractor by the City of Phoenix. The initial 3-year contract was extended 2-years due to quality performance. Once the 5-year contract term limit had expired, Felix was again selected for a new 3-year contract. Project Overview The City of Phoenix, AZ has a need for constant improvements, upgrades and rehabilitation to their 23rd […]

Read More ›

Central WWTP to Sundance WRF Effluent Pipeline

Felix and Dibble Engineering were selected as the Design-Build team to design and construct 5 1/2 miles of a 12-inch C900 transmission main to convey effluent from the Central Buckeye Wastewater Treatment Plant to the Sundance Water Reclamation Facility allowing the effluent to be used in the Sundance service area.

Read More ›

Valley Farms Arsenic Treatment Facility

Project Overview Felix teamed with GHD, Inc as the Design-Build team for the installation of an absorption arsenic removal system at two wells in the City of Coolidge. Scope included an 8-foot diameter arsenic pressure vessel, a 10,500 gallon backwash tank was designed to collect and store the backwash and forward rinse from the arsenic vessel. Role: Design-Build Owner: […]

Read More ›